⏳ Every minute you wait = $2,083 lost (Based on ABB data)
Still Waiting On That Backordered Pump?
Get the FREE – Quick+Easy Crossover Guide Engineers Are Calling a Lifesaver.
Free list of ready-to-ship MagDrive pumps and vendors – zero redesign required.

⏱ Downtime Is Bleeding Your Budget
And it’s not getting better anytime soon.
$125,000/hr
Avg. Unplanned Downtime
$532,000/hr
Process Manufacturing Losses
$129M/yr
Annual Loss in Some Facilities
“Unplanned downtime can cost up to $129M/year per facility.” – ABB
🧠 Why Engineers Are Calling This the Most Valuable PDF of 2025
🔐 Instant Access — No Waiting, No Redesign Needed