Skip to main content
LibertyCES — Engineering Line Direct: Call James Riggins at (559) 395-5500 — 30+ Years Spec Experience. No sales queue. Real engineering answers.
Sector Application

Double Containment Piping for Direct Lithium Extraction (DLE)

Multi-source documented

30+ years spec experience. Send James the process data and get a real answer — not a catalog page.

Request a Spec Review →
Direct answer

Yes. LibertyCES has documented Double Containment Piping in Direct Lithium Extraction (DLE) applications, including LiquidWatch II electronic leak detection. The right model depends on the fluid, concentration, temperature, flow and duty cycle, so send James your process data for a free spec review before final selection.

Notes from the vendor documentation

Duo-Pro is Asahi's own recommended system for DLE brine/acid handling per the ASAHI FOR DLE source; named chemistries are sodium hypochlorite, chlorine dioxide and acids (lithium-rich brine eluents). The 30-day EPA containment figure is the quotable design basis on a DLE permitting conversation.

Products cited in this application

Asahi/America Duo-Pro double containment in PP, PVDF or ECTFE (1x3 through 16x20, 150psi + drainage ratings, outer pipe designed to meet the EPA standard of at least 30 days of containment, simultaneous or staggered butt fusion, leak-detection cable installable on 2x6 and larger)Asahi/America PAL-AT cable-based leak detectionLiquidWatch II electronic leak detection

Real Specifications

SpecValueSource document
Duo-Pro size/pressure range1x3 through 16x20, 150 psi + drainage ratingsAsahi/America — General Catalog (Valves, Actuators, Piping Systems, Welding Equipment)
Outer pipe containment standardDesigned to meet the EPA standard of at least 30 days of containmentAsahi/America — General Catalog (Valves, Actuators, Piping Systems, Welding Equipment)
Leak detection cable install thresholdPAL-AT cable-based leak detection installable on 2x6 and largerAsahi/America — General Catalog (Valves, Actuators, Piping Systems, Welding Equipment)
Recommended DLE valve/actuator pairingType-14 Diaphragm Valve + Series 19 MAV MultiPack electric actuator, 75% duty cycle, NEMA 4X enclosureAsahi/America — General Catalog (Valves, Actuators, Piping Systems, Welding Equipment)
Duo-Pro materialsPP, PVDF, or ECTFEAsahi/America — General Catalog (Valves, Actuators, Piping Systems, Welding Equipment)
Install / Failure Note

Type-14's top-entry design isolates the bonnet from the fluid, so only the body and diaphragm (available in PVDF/PTFE/EPDM) ever touch the brine — the failure mode it's built to avoid is abrasive-slurry or corrosive-brine intrusion into the actuator side of the valve.

A DLE brine line runs acid and abrasive slurry continuously for the life of the plant — Duo-Pro's 30-day EPA containment design basis on the outer pipe is a real, vendor-published number worth quoting in a permitting conversation, not a rounded-up estimate.

Every claim on this page traces to real, vendor-published documentation on file with LibertyCES. Confirm current specifications with the manufacturer before final specification.

Related Guides

Direct Lithium Extraction Piping & Valve Infrastructure →Double Containment Is More Than Two Pipes →Industrial Process Piping Systems & Engineered Fabrication →

FAQ

How is Double Containment Piping used in Direct Lithium Extraction (DLE)?

Duo-Pro is Asahi's own recommended system for DLE brine/acid handling per the ASAHI FOR DLE source; named chemistries are sodium hypochlorite, chlorine dioxide and acids (lithium-rich brine eluents). The 30-day EPA containment figure is the quotable design basis on a DLE permitting conversation.

Which Double Containment Piping models are specified for Direct Lithium Extraction (DLE)?

Documented models include Asahi/America Duo-Pro double containment in PP, PVDF or ECTFE, Asahi/America PAL-AT cable-based leak detection, LiquidWatch II electronic leak detection. Confirm current specifications with the manufacturer before final selection.

What does LibertyCES need to size Double Containment Piping for a Direct Lithium Extraction (DLE) application?

The fluid and its concentration, operating temperature, flow or volume, pressure and suction conditions, duty cycle, and the existing equipment it replaces or connects to. James reviews it for free.

Ready to buy or need a fast answer? Call, text, or email James directly — (559) 395-5500 · [email protected].

Free spec review

Send James your spec

Fluid, concentration, temperature, flow or volume, and where it goes. James replies with a real answer, not a catalog page.

Reviewed by James Riggins, 30+ years specifying water and chemical process equipment · Updated