Integrated Chemical Feed Skid Systems: A Master Specifier’s Guide
Pre‑engineered chemical feed skids compress project timelines 25–30%, slash on‑site labor 25–75%, and shift integration risk into a controlled, ISO‑aligned build—so commissioning is predictable and uptime is protected.
The James Factor: Getting It Right the First Time
When you spec through James Riggins, you’re not just buying parts—you’re buying the 30‑year shortcut that eliminates the 30‑year mistakes.
Compare Leading Skid Families
Safety, speed, precision, and turnkey assurance—selected and integrated to your exact application.

- Simplex / Duplex / Triplex
- 150 PSI polyethylene frame
- PVC / CPVC / PVDF / PE / 316SS
- Floor or wall mount options

- Plug‑and‑play pre‑assembled
- Lead times as short as 1–3 weeks
- Single‑source pumps, sensors, controls
- Optional UL listed panels
- Up to 3000:1 digital turndown
- 15,000+ configurations
- Integrated controls & Fieldbus
- SCADA/DCS‑ready
- 2,000–16,000 GPD capacities
- Pre‑plumbed, wired & tested
- Grundfos booster pump standard
- Compact, serviceable layout
Specification Snapshot
| Family | System Types | Max Pressure | Mounting | Pipe Materials | Options |
|---|---|---|---|---|---|
| Blue‑White CFPS / CFCS / CFWS | Simplex / Duplex / Triplex | 150 PSI | Floor or Wall | PVC, CPVC, PVDF, PE, 316SS | Calibration cyl., gauges, dampener, flow meter, drip containment |
| ProMinent DULCODOS | Single / Dual | Application‑specific | Panel or Floor | Vendor standard polymer/metal options | Plug‑and‑play, UL panels, rapid lead times |
| Grundfos DSS | 1 / 2 / 3 pump | Per selection | Panel or Floor | Per configuration | Digital dosing (up to 3000:1), Fieldbus, SCADA/DCS |
| AXEON N‑Series RO | Single train | 200 PSI operating | Frame‑mounted | SS piping, RO grade components | Pre‑tested, compact service layout |
Safety & Compliance by Design
- Tube Failure Detection (TFD): instant pump shutoff + alarm when tubing ruptures; prevents small failures from becoming reportable spills.
- Integrated containment: drip basins and enclosures keep chemicals within the skid envelope.
- HazLoc‑ready options: enclosures and barriers for flammable/corrosive service per site requirements.
- Standardized documentation: P&IDs, I/O lists, O&M manuals for smooth commissioning and training.
Applications & Typical Specs
Real‑World Payback
Ready to Specify Your System?
Eliminate risk and ensure performance. Get a one‑on‑one system consultation with our lead engineer, James Riggins.
Frequently Asked Questions
What is an integrated chemical feed skid system?
A factory‑assembled package (pumps, piping, valves, controls, and documentation) designed and tested as a unit. It reduces onsite labor, compresses schedules, and provides single‑source accountability.
How do skids reduce project time 25–30%?
Complex mechanical and electrical assembly occurs off‑site in parallel with civil and utility work. This removes critical‑path dependencies and weather delays.
Which pressures and materials are supported?
Blue‑White families provide up to 150 PSI frames with PVC, CPVC, PVDF, PE, and 316SS options; others are configured per application.
How do you prevent leaks and spills?
Design features like Tube Failure Detection, drip containment, properly selected materials, and balanced back‑pressure eliminate common failure modes.
Do you provide FAT and handover documentation?
Yes—factory test options plus complete handover packs (P&IDs, I/O lists, O&M manuals) for smooth startup and training.
What’s a typical payback period?
Controls and safety features often pay back in 1–3 years on operational savings alone; risk avoidance accelerates ROI further.