Direct Lithium Extraction (DLE) Piping & Valve Infrastructure | Asahi/America via LibertyCES

The Critical Path for DLE is Not the Chemistry.
It's the Containment.

Why 60% of DLE downtime comes from valve & pipe failure—and how Asahi/America thermoplastics eliminate the risk.

60% Downtime from Pipe Failure
0 Corrosion Risk with PVDF
100K+ TDS Brine Handling

Why DLE Demands Thermoplastic Over Metal

Direct Lithium Extraction presents a unique chemical aggression: high chlorides + high heat + acid. Here's why Asahi/America thermoplastics are engineered to survive all three simultaneously.

Feature 316 Stainless Steel / Alloys Asahi/America (PVDF/PP) The DLE Advantage
Corrosion Resistance Vulnerable to chloride pitting & SCC in brines >100k TDS Inert to high-salinity brines & HCl/H₂SO₄ Zero replacement costs due to rust.
Thermal Conductivity High (Heat loss requires expensive insulation) Low (Natural insulator) Maintains 80°C geothermal brine temp efficiently.
Abrasion Resistance Low to Moderate High (Chem Proline®) Resists wear from silica/sand in raw brine.
Leak Detection External sensors only Integrated (Duo-Pro® Double Wall) Meets EPA mandates for hazardous reinjection lines.

The Complete DLE Infrastructure Solution

Three engineered systems that eliminate the corrosion bottleneck in lithium brine processing.

Duo-Pro Double Containment Piping for Lithium Brine Reinjection
Target: Lithium Brine Reinjection Piping

The Environmental Security Layer: Duo-Pro® Double Containment

Reinjecting spent brine is the highest environmental risk in DLE. One leak can halt operations for months. Duo-Pro® offers a 'pipe-within-a-pipe' failsafe with automated interstitial monitoring, fabricated off-site for rapid deployment in remote Salar or Geothermal fields. When EPA compliance isn't optional, Duo-Pro® is mandatory.

Series 19 Smart Pack Electric Actuator for DLE Automation
Target: Automated Valves for Lithium Extraction

The "Brain" of the Flow: Series 19 Smart Actuation

Modulating flow in adsorption columns requires precision down to the milliliter. The Series 19 Smart Pack isn't just an actuator; it's a diagnostic tool that speaks directly to your SCADA system, preventing process drift before it affects yield. Real-time torque monitoring and position feedback eliminate the guesswork in column optimization.

Chem Proline Advanced Polyethylene for Sulfuric Acid Lithium Processing
Target: Sulfuric Acid Piping Lithium

The Acid Handler: Chem Proline® (Advanced PE)

For the acid-wash and elution cycles that strip lithium from ion-exchange media, standard HDPE fails under thermal shock and aggressive pH swings. Chem Proline® is molecularly engineered for the 24/7 punishment of commercial DLE—handling concentrated H₂SO₄ at elevated temperatures without degradation, embrittlement, or permeation.

Don't Let a $500 Valve Stop a $500M Plant.

I've seen billion-dollar lithium projects delayed by months because they specified metal valves that seized in 4 weeks. DLE brings a unique chemical aggression—high chlorides + high heat + acid. I spec Asahi because it is the only system engineered to survive all three simultaneously. When you're building in the Atacama or the Salton Sea, there's no room for trial and error. The infrastructure has to work on day one, and it has to work for twenty years.

— James Riggins, LibertyCES

Precision Actuation Meets Industrial Reality

Electric actuators with spring return failsafe provide the reliability DLE demands. When power fails in remote geothermal fields, your valves move to safe position automatically—protecting both equipment and personnel. This isn't over-engineering. It's risk elimination.

Direct Lithium Extraction Infrastructure: Frequently Asked Questions

What is the best piping for geothermal lithium brine?

PVDF and Advanced PE (Chem Proline) are superior to metal due to chloride resistance at high temperatures. These thermoplastic materials are inert to high-salinity brines exceeding 100,000 TDS and maintain performance in temperatures up to 80°C without corrosion or structural degradation. Unlike 316 stainless steel which fails through stress corrosion cracking, thermoplastics provide decades of maintenance-free service.

How do you prevent leaks in lithium acid wash lines?

Double containment piping like Asahi Duo-Pro provides a secondary barrier with automated leak detection. This pipe-within-a-pipe system offers environmental security and meets EPA mandates for hazardous reinjection lines, preventing costly operational shutdowns. The interstitial space is continuously monitored, providing early warning before environmental release occurs.

Why does DLE demand thermoplastic over metal piping?

Metal piping is vulnerable to chloride pitting and stress corrosion cracking in high-salinity brines, while thermoplastics like PVDF and PP remain completely inert. Additionally, thermoplastics provide superior thermal insulation, reducing heat loss in geothermal brine loops and eliminating replacement costs due to corrosion. The total cost of ownership favors thermoplastics by 3:1 over a 20-year plant life.

What causes most DLE plant downtime?

Approximately 60% of DLE downtime stems from valve and pipe failure due to the unique chemical aggression of high chlorides, high heat, and acidic conditions. Asahi/America thermoplastic systems are engineered to survive all three simultaneously, eliminating this critical failure point. Most DLE failures occur not during steady-state operation but during thermal cycling and pH transitions—exactly where thermoplastics excel.

Ready to Eliminate Corrosion as Your Critical Path?

LibertyCES has specified Asahi/America systems for DLE projects across three continents. Let's discuss your specific brine chemistry, flow rates, and containment requirements.

Schedule Your DLE Infrastructure Consultation